Tender Qualifications and Exclusions: What a Subcontractor Should List
A practical guide for subcontractors pricing a package: what to state with your price, the six items worth stating with every price, and how to make sure your qualifications end up in the contract you sign.
What should a subcontractor list as qualifications and exclusions?
State the documents and drawing revisions you priced, the assumptions your price depends on (such as working hours, access, attendances and how long the price stays open) and the work or cost it does not include. Keep each item specific to this tender and tied to a document or a gap you found. Qualifications that are not carried into the contract may not count, so check the subcontract's list of contract documents includes your tender or deals with the same points, and whether its conditions take priority over your tender. Raise anything missing in writing before you sign. Starting work on the main contractor's terms can mean you accept them, and objecting in writing does not by itself settle whose terms apply, so agree the points in writing before you start where you can. General information for England and Wales (Scotland differs in places), not legal advice. Take advice if the terms are unclear or the job is large.
How we handle this: Estimating and tender pricing
Read on from this guide
- Unclear Scope Becomes Your Cost: How variations are valued
- The Subcontract Terms You Have Seen: How delay damages work for subcontractors
- Check the List of Contract Documents: Subcontract review before you sign
Related guides
- Liquidated Damages: Challenging a Delay Deduction: How delay damages work in a subcontract, and when a deduction from your payment can be challenged.
- Valuing Variations Without Losing Margin: How to record change properly, price it on a defensible basis, and stop extras leaking into dispute.
- Pay-When-Paid Clauses: Why a clause tying your payment to the main contractor being paid is usually ineffective.
- Does the Construction Act Apply?: Check your contract is covered before you rely on the Act's payment, suspension and adjudication rights.
Questions we hear all the time
- What is the difference between a qualification and an exclusion?
- A qualification states an assumption your price depends on, such as the drawing revision, the working hours or who provides access. An exclusion states work or cost your price does not include. Both mark the boundary of what you priced, so, if they form part of the contract, anything outside it can be valued as a change.
- Will a long list of exclusions count against my tender?
- It can make your price harder to compare with others, and some tender instructions ask for a compliant bid or for qualifications in a set form, so a heavily qualified price may be set aside. Keep each item specific to this tender and tied to a document or a gap you found. A short list the main contractor can deal with in the subcontract is easier to agree than pages of standard wording.
- Can I add qualifications after I have won the work?
- Only if the main contractor agrees. If it has already accepted your tender as it stands, a contract may exist even before anything is signed, and changing the basis of your price is then a negotiation. Raise anything you missed in writing as soon as you find it, and before you sign or start work.
- The main contractor wants my qualifications removed. What now?
- Your price was built on them, so removing one moves that risk to you. Price the risk, agree how each point is dealt with in the subcontract before you sign, or decline the work if neither is possible.
- Do tender query answers form part of the contract?
- Generally only if the contract includes them, directly or by listing your tender. List the query answers among the documents your price is based on, and check the subcontract's list of contract documents includes them or deals with the same points.
- Can you set out my qualifications and exclusions for me?
- Yes. Our estimating service measures the work, builds the rates and provides a structured estimate with clear qualifications and exclusions, and we flag gaps or conflicting information in the tender documents so you can raise them before you submit. We can also review a price you have already put together. Our estimating service
- Is this guide legal advice?
- No. It is practical guidance on pricing and submitting a tender. Whether a qualification forms part of your contract depends on the documents and what happened when the contract was made, so take advice if the terms are unclear or the job is large. The points here are general, and the law in Scotland differs in places.