An estimating service for subcontractors
More tenders than time to price them? We measure the work, build the rates and review your allowances and margin, so you know what is behind the price you send.
Free discovery call, no obligation. We reply the same working day, then on the call we talk through how we can help and agree the scope before any work starts.
Where we usually come in
- Too many tenders, too little time. Invitations arrive faster than you can measure and price them, so some go in rushed and some do not go in at all.
- Items missed in the measure. Work left out of the take-off comes back as a loss once you are on site.
- Exclusions left unclear. Qualifications and exclusions are not set out, so scope you never priced becomes your problem.
- Delay damages nobody priced. The subcontract can make you pay if you finish late, at a set rate or as the main contractor's proven loss, which can include damages its client deducts. If you do not ask at tender which applies, what rate sits behind it (yours or the main contract's) and whether there is a cap, that risk sits in a price that never allowed for it. Subcontract review before you sign
- Margin squeezed to win. Rates get cut to win the work without a clear view of what the job will cost to deliver.
Questions people ask first
- What do you need from me to price a tender?
- The tender drawings and specifications, the bill of quantities or pricing schedule if there is one, your trade scope and the exclusions you propose, and the submission date and tender instructions. Send what you have; we tell you if anything is missing.
- What do I get back?
- A structured estimate with measured quantities, the materials, labour, plant and overhead allowances behind each rate, and clear qualifications and exclusions. We also flag gaps or conflicting information in the tender documents, so you can raise them before you submit. We do not quote a tender win rate, because winning depends on more than the price.
- Can you check a price I have already put together?
- Yes. We review your existing pricing and the calculations behind it, and check your allowances and margin before the tender goes in.
- What about delay damages in the subcontract?
- Ask about them before you price. Some subcontracts set their own rate for finishing late, usually per day or per week. Others, including the standard JCT subcontracts, set no rate unless amended, and let the main contractor claim the loss your lateness actually caused it, which it has to show and which can include damages its client deducts under the main contract. Either way, find out which kind applies, the subcontract rate or, if there is none, the main contract rate behind the main contractor's loss, the date it runs from and whether there is a cap (there is only a cap if the contract sets one, which may be in a general limit on liability), then price or qualify the risk before the tender goes in. In our scope review we flag delay damages terms that are missing or unclear as information to clarify before you submit, working from the tender documents and any subcontract terms you send us.
- How quickly can you turn a tender round?
- It depends on the size of the package and the submission date. We confirm the documents, the trade scope and the deadline when we review the tender, and agree the timetable with you before work starts. Send the tender as soon as it arrives so there is time to raise queries.
- Which trades do you price?
- All subcontractor trades, including mechanical and electrical, drylining, roofing, groundworks, steelwork, joinery, painting and decorating, flooring, cladding and brickwork.
- What does it cost?
- The first call is free and there is no obligation. On Bronze, Silver and Gold, estimating is sold in monthly credits. Each credit covers one estimating instruction, such as a tender estimate or a priced bill of quantities, with one round of reasonable amendments. A change of scope or drawings, or a re-measure, counts as a new instruction. Bronze includes one credit a month, Silver three and Gold five, and Platinum includes unlimited estimating as part of full quantity surveying support, subject to reasonable commercial use. If you have one tender to price and it fits one instruction (each instruction is scoped when it is booked), Bronze has no minimum term: cancel before the next monthly renewal to stop the next charge, and access runs to the end of the month you have paid for. Silver and Gold are billed monthly in advance and Platinum weekly in advance; they can be cancelled by written notice before the end of day 30, after which 90 days' written notice applies and fees remain payable during the notice period. Fees paid are not refunded on any plan, including if you cancel in the first 30 days. Unused monthly credits do not roll over. Extra credits can be bought on Bronze, Silver and Gold from Membership in your Quantis workspace. The prices are on the pricing page, where the plans show estimating credits as service credits.
Loading the full Contract Group experience…