Variation claims for subcontractors
Extra or changed work was instructed on site and it has not been valued, agreed or paid. We put the instruction, the records and the build-up together on the basis your subcontract sets, so each variation goes into your application with the evidence and build-up the contractor needs to value it.
Free discovery call, no obligation. We reply the same working day, then on the call we talk through how we can help and agree the scope before any work starts.
Where we usually come in
- Instructed on site, never in writing. The site manager asked for the change and you did the work, but there is no written instruction, and now the contractor says it was never instructed or was in your scope.
- Left out of the valuation. Variations go in with each application and keep coming back at nil or "under review", so the value builds up from one month to the next without being valued. Got a pay less notice? Check it free
- Daywork sheets not signed. The work was done on daywork, but the sheets were not signed at the time, or were signed "for record only", and the contractor will not accept the hours or the rates.
- Valued at a rate you never agreed. The contractor has accepted the change but valued it on its own rates or a measure you do not recognise, with no build-up you can check.
- Dragged into the final account. Months of variations are still open at the end of the job, and the final account has turned into an argument about all of them at once. Final account gone quiet? How we handle it
Questions people ask first
- What does it cost?
- The first call is free and there is no obligation. Ongoing quantity surveying, including valuing variations, is part of the Platinum plan, and we agree the scope, the information we need and the next steps before any work starts. If you want help with a set of variations or one final account rather than ongoing support, you can book consultancy without a plan: by the hour, half day (up to 4 hours) or full day (up to 8 hours), with no monthly fee, subject to availability. The day rates and how each is billed are on the pricing page.
- Can I still claim a variation without a written instruction?
- Sometimes, yes. You need other evidence that the change was instructed, accepted or knowingly taken into the works: emails, site minutes, marked-up drawings, RFIs, photos and records made at the time. Some subcontracts set a written procedure or a notice within a set time for variations, and failing to follow it can cost you the claim, so we read the clause before saying where you stand. If an instruction was given verbally, confirm it in writing the same day, and give any notice the clause requires within its time limit, even while the instruction is disputed.
- Does the Construction Act help?
- It can, on payment. Where the Act applies, a variation that the subcontract says is to be valued and paid in the interim payments is part of the sum due like any other work, so the payment notice and pay less notice rules apply to it. If the payer gives no payment notice, the sum you can rely on is the one in your application, where your contract treats it as the payment notice, or otherwise in a default payment notice you give, so include each variation there with its value and the basis on which it is calculated. To pay less than the notified sum, the payer must give a pay less notice in time. If the payer gives a payment notice that values a variation at nil, that is the notified sum, and the way to challenge the valuation is adjudication, not a pay less notice. The Act does not decide whether a change was instructed or what it is worth; your subcontract does. A dispute about either can be referred to adjudication at any time under section 108. The current payment notice rules apply to contracts made on or after 1 October 2011 (1 November 2011 in Scotland). If you are unsure, take advice before you act on a deadline.
- Is this debt collection?
- No. We act as your quantity surveyor: we read the variation clause, put the instruction and the records behind each claim, measure and price it, and prepare the applications, notices and submissions your subcontract requires, with adjudication support if it gets that far.
- How quickly will you get back to me?
- We reply to enquiries the same working day. If a deadline is already running, say so in your message, or call 0161 240 6996, Monday to Friday, 8:30am to 5:30pm.
- Do you cover my area?
- We are based in Oldham, Greater Manchester, and work with subcontractors across England, Wales and Scotland. The work is done remotely, so where your site is in those nations does not limit the support.